A new build takes every stage. A renovation skips feasibility and the foundation; interiors skip the civil work; a takeover starts with an audit and joins where the building is. Each project's plan can be tailored, and on a live site the PMC's changes wait for the owner.
आरंभ1 · StartWho is involved, what is wanted, what is on site.
संभावना2 · Feasibility and conceptWhat the rules allow, a first layout, a first cost and the look.
डिज़ाइन3 · Design and engineeringFreeze the architecture, engineer it, design the interiors.
अनुबंध4 · Cost, approvals, awardPrice it line by line, get permissions, contract the builders.
तैयारी5 · Buy and mobiliseOrder long-lead items; make the site safe and ready.
निर्माण6 · BuildFloor by floor, each check released before work is covered.
सौंपना7 · Complete and hand overTest everything, fix the snags, hand over with records.
देखभाल8 · AftercareDefect liability, warranties and the home's upkeep.